Mapped (unverified)colocation
Jb1
Bintaro, Banten, Indonesia
Source: Primary source
Jb1 is a mapped data center in Banten, Indonesia. It runs on Indonesia's grid, which was 82% fossil-fuelled at 681 gCO₂e/kWh in 2024 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
681 gCO₂/kWh
Clean electricity
18%
Region
Banten
Overview
source: linkPrinceton Digital Group — colocation facility (11 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
681 gCO₂/kWh
Clean electricity
18%
Fossil electricity
82%
National grid context, not this facility's own metering. Full country picture: Indonesia data centers.
In the news
source: Google News (local + English)- Arkonin Ungkap Kembali Proses Desain RSPI Bintaro Jaya, Karya Ikonik Infrastruktur Kesehatankonstruksimedia.com· May 28, 2026
- Update Banjir Jakarta Selasa Siang: 80 RT dan 3 Ruas Jalan Masih Tergenang, Ketinggian Air Capai 100 CmAkurat Jakarta· May 5, 2026
- Banjir Masih Genangi 11 RT di Jaksel, Ketinggian Capai 1,3 meterMetroTVNews.com· May 1, 2026
- Update Banjir Jakarta: 75 RT dan 19 Jalan Terendam Pagi IniMetroTVNews.com· Mar 8, 2026
- Laporan JLL: Kapasitas Data Center Global Bakal Lipat Ganda di 2030, Indonesia Jadi Target Utamakonstruksimedia.com· Jan 14, 2026
- Hujan Deras Picu Tanggul Jebol! Tiga Titik di Tangsel Terendam BanjirRMBanten· Oct 31, 2025
See something wrong or missing on this page? Suggest a correction.