Mapped (unverified)colocation
ITENOS Hamburg (HAM1)
Hamburg, Hamburg, Germany
Source: Primary source
ITENOS Hamburg (HAM1) is a mapped data center in Hamburg, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Hamburg
Overview
source: linkITENOS GmbH — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Deutsche Pfandbriefbank-Aktie (DE0008019001): Neues 45-Millionen-Darlehen für Rechenzentrum rücktAD HOC NEWS· Jun 13, 2026
- PBB finanziert Rechenzentrum bei Hamburgimmobilienmanager· Jun 12, 2026
- IT-Störung in der Justiz: Rechenzentrum in Celle betroffenMSN· Jun 11, 2026
- Rechenzentrum der Universität Hamburg muss saniert werdenDataCenter-Insider· Jun 9, 2026
- Schäden an der Bausubstanz und Schadstoffe: Rechenzentrum der Uni Hamburg muss saniert werdenNDR.de· Jun 5, 2026
- Raus aus der Cloud: Neues Rechenzentrum in LübeckHL-live· Mar 10, 2026
See something wrong or missing on this page? Suggest a correction.