Mapped (unverified)colocation
InAsset Udine
Pasian di Prato, Friuli-Venezia Giulia, Italy
Source: Primary source
InAsset Udine is a mapped data center in Friuli-Venezia Giulia, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Friuli-Venezia Giulia
Overview
source: linkInAsset Srl — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)See something wrong or missing on this page? Suggest a correction.