Mapped (unverified)
Green Mountain Ytre Enebakk
Akershus, Norway
Source: OpenStreetMap
Green Mountain Ytre Enebakk is a mapped data center in Akershus, Norway. DataCentersExposed has documented a 35,215 sq ft footprint at this site. It runs on Norway's grid, which was 1% fossil-fuelled at 28 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~5-15 MW
Footprint
35,215 sq ft
Grid carbon
28 gCO₂/kWh
Clean electricity
99%
DC power price
6.47¢/kWh
Region
Akershus
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
28 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
6.47¢/kWh
A large data center in Norway pays 6.47¢/kWh for electricity — a household pays 19.02¢, 66% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Norway data centers.
In the news
source: Google News (local + English)- Datasenteret på Gran kobles til Oljefond-kontroversEnebakk Avis· Aug 15, 2025
- Dataskyggene: Innsiden av Norges grønne datasuksessOsloMet· May 31, 2025
- Næringsliv, Ytre Enebakk | Fem år etter oppstarten: Har investert over tre milliarder i EnebakkEnebakk Avis· Mar 24, 2025
- Green Mountain i Enebakk: 5 år med vekst, arbeidsplasser og milliarder i verdiskapingMynewsdesk· Mar 19, 2025
- Utvider datasenteret på EnebakkDigi.no· Nov 17, 2023
- Stilte spørsmål om kraftreservene i Enebakk - dette er svaret som ble gittEnebakk Avis· Jun 16, 2023