Mapped (unverified)colocation
GLOBE Development Datacenter Münster
Münster, Nordrhein-Westfalen, Germany
Source: Primary source
GLOBE Development Datacenter Münster is a mapped data center in Nordrhein-Westfalen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Nordrhein-Westfalen
Overview
source: linkGLOBE Development GmbH — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Digitalisierung: Alle wichtigen Meldungen auf einen BlickZFK – Zeitung für kommunale Wirtschaft· Jun 10, 2026
- Datacenter Münster Osnabrückradio rst· May 13, 2026
- Das Datacenter Münster Osnabrück ist offiziell gestartetwirtschaft-aktuell.de· May 4, 2026
- „Digitaler Meilenstein für die Region“: 10 Millionen Euro teures Rechenzentrum startet am FMOnoz.de· May 4, 2026
- Digital Cleanup Week 2026Universität Münster· Mar 20, 2026
- TECH.LAND Xperience in Münster überwindet Grenzenwirtschaft-aktuell.de· Mar 12, 2026
See something wrong or missing on this page? Suggest a correction.