GlobalConnect Trondheim is a mapped data center in Trøndelag, Norway, operated by GlobalConnect. It runs on Norway's grid, which was 1% fossil-fuelled at 28 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
GlobalConnect
Operator
GlobalConnect
Grid carbon
28 gCO₂/kWh
Clean electricity
99%
DC power price
6.47¢/kWh
Region
Trøndelag
Overview
source: linkGlobalConnect Group — colocation facility (6 networks present). Source: PeeringDB.
Operator chain
- Ultimate parentGlobalConnect
- Files asGlobalConnect
- This facilityGlobalConnect Trondheim
The grid behind this site
source: Ember · EurostatGrid carbon intensity
28 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
6.47¢/kWh
A large data center in Norway pays 6.47¢/kWh for electricity — a household pays 19.02¢, 66% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Norway data centers.
In the news
source: Google News (local + English)- Globalconnect har oppgradert flere fibertraseer mellom Norge og SverigeDigi.no· Apr 6, 2026
- Globalconnect bygger ny nordisk fiber-rute via OsloDigi.no· Nov 6, 2024
- Global Connect completes its new wavelength network in ScandinaviaW.Media· Apr 8, 2026
- GlobalConnect to triple Nordic internet capacity with major fiber build-outSDxCentral· Jan 23, 2026
- GlobalConnect completes Phase I of Nordic Wave subsea cableData Center Dynamics· Mar 8, 2025