Skip to content
DataCentersExposed
Mapped (unverified)colocation

GlobalConnect Nydalen

Oslo, Oslo, Norway

Source: Primary source

GlobalConnect Nydalen is a mapped data center in Oslo, Norway, operated by GlobalConnect. It runs on Norway's grid, which was 1% fossil-fuelled at 28 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 17, 2026

Real parent
GlobalConnect
Operator
GlobalConnect
Grid carbon
28 gCO₂/kWh
Clean electricity
99%
DC power price
6.47¢/kWh
Region
Oslo
Attribution & capacity confidence:mediumprimary source

Overview

source: link

GlobalConnect Group — colocation facility (2 networks present). Source: PeeringDB.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
28 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
6.47¢/kWh

A large data center in Norway pays 6.47¢/kWh for electricity — a household pays 19.02¢, 66% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Norway data centers.

See something wrong or missing on this page? Suggest a correction.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.