Mapped (unverified)colocation
GELSEN-NET DC Resse
Gelsenkirchen, Nordrhein-Westfalen, Germany
Source: Primary source
GELSEN-NET DC Resse is a mapped data center in Nordrhein-Westfalen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Nordrhein-Westfalen
Overview
source: linkGELSEN NET — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Stromausfall in Rechenzentrum: Regelbetrieb läuft wieder anWDR· Mar 4, 2026
- IT-Störung bei den Städten Gladbeck und GelsenkirchenRadio Emscher Lippe· Mar 3, 2026
- Essen bekommt ein Rechenzentrum mit Internet-KnotenDataCenter-Insider· Mar 10, 2021
- Germany unveils a teddy bear as the mascot for Euro 2024 but this time with pantsWSLS· Jun 20, 2023
- Gelsenkirchen: A Small, Smart City with Big PlansHuawei Enterprise· Apr 7, 2023
See something wrong or missing on this page? Suggest a correction.