Mapped (unverified)colocation
GC-FAB7 Stavanger
Stavanger, Rogaland, Norway
Source: Primary source
GC-FAB7 Stavanger is a mapped data center in Rogaland, Norway, operated by GlobalConnect. It runs on Norway's grid, which was 1% fossil-fuelled at 28 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
GlobalConnect
Operator
GlobalConnect
Grid carbon
28 gCO₂/kWh
Clean electricity
99%
DC power price
6.47¢/kWh
Region
Rogaland
Overview
source: linkGlobalConnect Group — colocation facility (3 networks present). Source: PeeringDB.
Operator chain
- Ultimate parentGlobalConnect
- Files asGlobalConnect
- This facilityGC-FAB7 Stavanger
The grid behind this site
source: Ember · EurostatGrid carbon intensity
28 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
6.47¢/kWh
A large data center in Norway pays 6.47¢/kWh for electricity — a household pays 19.02¢, 66% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Norway data centers.
In the news
source: Google News (local + English)See something wrong or missing on this page? Suggest a correction.