Mapped (unverified)colocation
GavleNet Operatörshotell
Gävle, Gävleborgs län, Sweden
Source: Primary source
GavleNet Operatörshotell is a mapped data center in Gävleborgs län, Sweden. It runs on Sweden's grid, which was 1% fossil-fuelled at 35 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
35 gCO₂/kWh
Clean electricity
99%
DC power price
7.47¢/kWh
Region
Gävleborgs län
Overview
source: linkGävle Energi AB — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
35 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
7.47¢/kWh
A large data center in Sweden pays 7.47¢/kWh for electricity — a household pays 23.51¢, 68% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Sweden data centers.
In the news
source: Google News (local + English)- INSÄNDARE: Gävle kan bli mer än en amerikansk serverhallGefle Dagblad· Apr 21, 2026
- Datacenter i Lingbo kan börja byggas i år: ”En förhoppning som jag delar”SVT Nyheter· Feb 8, 2026
- Microsoft-bygge varnade anställda för facketByggnadsarbetaren· Sep 24, 2025
- Facket protesterar mot Microsoft och Amazon – med tre meter hög råttaDagens Arbete· Sep 15, 2025
- Jätteråtta utanför datacentren i Gävle – här är konfliktenGefle Dagblad· Aug 8, 2025
- Microsoft lägger jättebygge i Sandviken på isComputer Sweden· Apr 23, 2025
See something wrong or missing on this page? Suggest a correction.