Skip to content
DataCentersExposed
Mapped (unverified)

EWE TEL data center, Oldenburg

Oldenburg, Niedersachsen, Germany

Source: OpenStreetMap

EWE TEL data center in Niedersachsen, Germany is a mapped facility, operated by EWE TEL GmbH. DataCentersExposed has documented a 25,027 sq ft footprint at this site. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
EWE TEL GmbH
Operator
EWE TEL GmbH
Est. capacity
~5-15 MW
Footprint
25,027 sq ft
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Niedersachsen
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

EWE TEL GmbH operates this mapped data center in Oldenburg, Germany. The site has a reported footprint of 25,027 square feet. Ownership above EWE TEL GmbH is not disclosed in available records.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh

A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Germany data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.