Evocative Secaucus

Hudson County, NJ

Source: OpenStreetMap

Evocative Secaucus is an operating data center in Hudson County, NJ. DataCentersExposed has documented a 101,304 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Operator
Est. capacity
~20-45 MW
Footprint
101,304 sq ft
Utility
Public Service Elec & Gas Co
Grid
PJM
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Evocative Secaucus is an operating data center in Hudson County, New Jersey, run by Evocative. Public records put its footprint at 101,304 square feet. The site draws power from Public Service Elec & Gas Co inside the PJM grid. Ownership above Evocative is not disclosed in available records.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

Modeled estimate~93.6K gpd
Direct (onsite cooling)
~45.6K gpd
Indirect (its electricity)
~48K gpd

No measured record exists, so this is a low-confidence model from 5 MW (interconnection capacity): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

What this site costs the grid

source: PJM RPM auction reports
PSEG (New Jersey) · 2027/28 auction
$333 /MW-day
Peaked at $245/MW-day in 2013/14 8.84× the rest of PJM

PJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's PSEG pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →

This site's capacity-market cost (estimated)
$2.4M to $5.5M/yr

An estimated ~20 to 45 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.

Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →

Air quality near this site

source: AirNow
68
PM2.5
Moderate
54
O3
Moderate

Air Quality Index from the nearest AirNow reporting area (Northeast Urban), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$100.8K
People of color
72%
Below poverty
3%
Tract population
5,194

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Clarendon School in Secaucus, is 0.2 mi from this site (469 students). 2 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.