Euclyde DC3
Provence-Alpes-Côte d'Azur, France
Source: OpenStreetMap
Euclyde DC3 is a mapped data center in Provence-Alpes-Côte d'Azur, France, operated by Euclyde. DataCentersExposed has documented a 5,091 sq ft footprint and 1 environmental-permit record at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkEuclyde DC3 is a mapped data center in France, operated by Euclyde. Available records list a footprint of 5,091 square feet. No parent company above Euclyde is disclosed in available records, and no operational details beyond its mapping are confirmed.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Euclyde Datacenters rachète un centre de données en Île-de-FranceTribuca· Oct 12, 2025
- Euclyde Datacenters devient nLighten FranceChannelNews· Nov 26, 2024
- Euclyde Datacenters affiche plus de 30 % de croissance en 2023Distributique· Jan 26, 2024
- Un nouveau datacenter pour Euclyde en AlsaceGoodTechInfo· Jun 30, 2023
- Un nouveau datacenter à Strasbourg pour EuclydeGoodTechInfo· Dec 14, 2022
- Illkirch-Graffenstaden. Le data center d’Euclyde sera mis en service au 4e trimestre 2021DNA· Jun 13, 2021
Environmental permits
source: Géorisques (ICPE)- SEARLE CHIMIE INSTRUMENT0006406612ICPE Autorisation · Valbonne 06560 · registered as "SEARLE CHIMIE INSTRUMENT" · ~101 m from the mapped location