Skip to content
DataCentersExposed
Mapped (unverified)

ESAT 1 Cable Landing Station

Cornwall, United Kingdom

Source: OpenStreetMap

ESAT 1 Cable Landing Station is a mapped data center in Cornwall, United Kingdom, operated by BT Group. DataCentersExposed has documented a 2,837 sq ft footprint at this site. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
BT Group
Operator
BT Group
Footprint
2,837 sq ft
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
Cornwall
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

ESAT 1 Cable Landing Station is a mapped data center in the United Kingdom, operated by BT Group. Public records put its footprint at 2,837 square feet. Available notes tie the site to BT Ireland data center operations.

Operator chain

  • Ultimate parent
    BT Group
  • Files as
    BT Group
  • This facility
    ESAT 1 Cable Landing Station

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%

National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.