ESAT 1 Cable Landing Station
Cornwall, United Kingdom
Source: OpenStreetMap
ESAT 1 Cable Landing Station is a mapped data center in Cornwall, United Kingdom, operated by BT Group. DataCentersExposed has documented a 2,837 sq ft footprint at this site. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkESAT 1 Cable Landing Station is a mapped data center in the United Kingdom, operated by BT Group. Public records put its footprint at 2,837 square feet. Available notes tie the site to BT Ireland data center operations.
Operator chain
The grid behind this site
source: Ember · EurostatNational grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Bharti Airtel looks to raise stake in BT – reportBeBeez International· May 22, 2026
- BT revives talks over international unit - reportData Center Dynamics· May 19, 2026
- BT and Nscale partner to build sovereign AI DCs with NVIDIA’s AI infrastructure in the UKW.Media· Apr 27, 2026
- How a BT, Nscale partnership plans to advance UK AI sovereigntycapacityglobal.com· Apr 24, 2026
- UK's BT and Nscale team up to build 14MW of AI capacityIndiatimes· Apr 24, 2026
- Nvidia-Backed Nscale and BT Partner to Expand 14MW AI Data Centre Capacity in the UKCXO Digitalpulse· Apr 24, 2026