Equinix New York Secaucus NY5 is an operating data center in Hudson County, NJ, operated by Equinix, Inc.. DataCentersExposed has documented a 211,455 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 12, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkEquinix data center
Operator chain
- Ultimate parentEquinix, Inc.
- Files asEquinix, Inc.
- This facilityEquinix New York Secaucus NY5
In the news
source: Google News- Options announces deployment of its new liquid-cooled high-density cage in Equinix’s IBX data center in SecaucusFX News Group· Jan 23, 2026
- With AI booming, NJ is a growing data center hub. But what about electric, water use?Bergen Record· Dec 2, 2025
- Cboe EDGA Equities Exchange migrates secondary data center to Equinix facility in IllinoisData Center Dynamics· Aug 6, 2025
- InterServer selects 365 Data Centers for expansion into New JerseyData Center Dynamics· Jan 8, 2025
- A new wave of data center demand is coming to New Jersey, but supply may be tighter than everRE-NJ· Jun 5, 2024
- NYSE Network Extends to Equinix NJ SiteData Center Knowledge· May 31, 2024
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Equinix, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's PSEG pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~40 to 85 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Nearest school
source: HIFLD / NCESThe nearest public school, Clarendon School in Secaucus, is 0.9 mi from this site (469 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline