Skip to content
DataCentersExposed
Mapped (unverified)

Equinix Genoa GN1

Genova, Liguria, Italy

Source: OpenStreetMap

Equinix Genoa GN1 is a mapped data center in Liguria, Italy, operated by Equinix, Inc.. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Equinix, Inc.
Operator
Equinix, Inc.
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Liguria
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Equinix Genoa GN1 is a mapped data center in Genova, Italy, operated by Equinix, Inc. Available records identify it as an Equinix data center but disclose no capacity, footprint, or environmental enforcement details. Ownership above Equinix, Inc. is not listed in the facts on hand.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh

A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Italy data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.