Skip to content
DataCentersExposed
Mapped (unverified)

ennit GmbH

Kiel, Schleswig-Holstein, Germany

Source: OpenStreetMap

ennit GmbH is a mapped data center in Schleswig-Holstein, Germany, operated by TNG Group. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
TNG Group
Operator
TNG Group
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Schleswig-Holstein
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

ennit GmbH is a mapped data center in Kiel, Germany, operated by TNG Group. Available records identify it as a TNG Group data center but do not disclose an ultimate parent above the operator. No capacity, footprint, or environmental enforcement figures appear in the available record.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh

A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Germany data centers.

No recent coverage found for this facility.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.