Efx is a mapped data center in Noord-Brabant, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Noord-Brabant
Overview
source: linkEindhoven Fiber eXchange B.V. — colocation facility (26 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- “We raken terrein kwijt” – datacenters hebben ruimte nodigioplus.nl· May 17, 2026
- Hoe data de wereld over reizen is ondoorgrondelijk. Kan je dan nog digitaal soeverein zijn?NRC· May 15, 2026
- Kort: Nog geen stroom in NorthC-datacenter, campagne EZK over noodvoorzieningen (en meer)Computable.nl· May 11, 2026
- Zeer grote brand bij datacenter in AlmereHart van Nederland· May 7, 2026
- Een kijkje in het gebouw dat het internet laat stromenioplus.nl· May 3, 2026
- Netbeheerder Tennet hoeft datacenter niet direct aan te sluiten op overvol stroomnetNOS· Apr 29, 2026
See something wrong or missing on this page? Suggest a correction.