Skip to content
DataCentersExposed
Mapped (unverified)

DC Noovle Cebrosa

Piemonte, Italy

Source: OpenStreetMap

DC Noovle Cebrosa is a mapped data center in Piemonte, Italy, operated by Noovle S.p.A. DataCentersExposed has documented a 53,738 sq ft footprint at this site. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Noovle S.p.A
Operator
Noovle S.p.A
Est. capacity
~10-25 MW
Footprint
53,738 sq ft
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Piemonte
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

DC Noovle Cebrosa is a mapped data center in Italy operated by Noovle S.p.A. Available records put its footprint at 53,738 square feet. Ownership above Noovle S.p.A. is not detailed in the facts on file.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh

A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Italy data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.