Mapped (unverified)colocation
Datacenter Leipzig - envia TEL GmbH
Taucha, Sachsen, Germany
Source: Primary source
Datacenter Leipzig - envia TEL GmbH is a mapped data center in Sachsen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Sachsen
Overview
source: linkenvia TEL GmbH — colocation facility (19 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Essen angebrannt - Feuerwehr kommtnordsachsen24.de· Jun 16, 2026
- Dritter Einsatz für die Feuerwehr TauchaTaucha kompakt· May 27, 2026
- Mega-Deal im US-Strommarkt: NextEra schluckt DominionEnergynewsmagazine· May 18, 2026
- Mehrheitlicher Beschluss für Abwärmenetz in TauchaTaucha kompakt· Dec 15, 2025
- Ehemalige Pelzfabrik: Stadtrat macht Weg frei für B-Plan Westvorstadt 1Taucha kompakt· Nov 13, 2025
- T.RAUMFABRIK Taucha: Nachfrage übertrifft Erwartungen - Baugenehmigung liegt noch nicht vorTaucha kompakt· Sep 30, 2025
See something wrong or missing on this page? Suggest a correction.