Mapped (unverified)
Data Center (Ministério Público de Minas Gerais)
Minas Gerais, Brazil
Source: OpenStreetMap
Data Center (Ministério Público de Minas Gerais) is a mapped data center in Minas Gerais, Brazil. DataCentersExposed has documented a 6,955 sq ft footprint at this site. It runs on Brazil's grid, which was 11% fossil-fuelled at 110 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Footprint
6,955 sq ft
Grid carbon
110 gCO₂/kWh
Clean electricity
89%
Region
Minas Gerais
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
110 gCO₂/kWh
Clean electricity
89%
Fossil electricity
11%
National grid context, not this facility's own metering. Full country picture: Brazil data centers.
In the news
source: Google News (local + English)- Participantes de seminário pedem requisitos ambientais para instalação de centros de processamento de dadosBOM DIA GUARULHOS· Jun 10, 2026
- Parlamentares e especialistas pedem marco legal para data centers de inteligência artificial no BrasilInforme Manaus· Jun 10, 2026
- Órgãos propõem adequações ambientais em obra de data center de bilhões do TikTokG1· May 21, 2026
- MPF e DPU pedem adequações em licenciamento ambiental de data center antes do início da operação no Cearámpf.mp.br· May 20, 2026
- Governo contrata quase 20 GW em ‘maior leilão da história’, mas efeito na tarifa preocupa; veja o Radar Energia XP | MarçoXP Investimentos· Mar 19, 2026
- Corrida dos data centers no Brasil ignora impacto ambiental e tem até uso de identidades falsasAos Fatos· Mar 17, 2026