Mapped (unverified)colocation
Custodian CDC Maidstone 1
Maidstone, Kent, United Kingdom
Source: Primary source
Custodian CDC Maidstone 1 is a mapped data center in Kent, United Kingdom. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
Kent
Overview
source: linkCustodianDC LTD. — colocation facility (10 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Engie to acquire UK Power Networks in £10.5bn dealData Center Dynamics· Mar 2, 2026
- UK MSP Redcentric offloads data center business for £127mData Center Dynamics· Oct 23, 2025
- UK MSP Redcentric confirms talks to potentially sell data center businessBeBeez International· Aug 22, 2025
- Dalkia refreshes deal with Colt Data Centre ServicesFacilitate Magazine· Aug 6, 2025
- UK Power Networks installs UK's first smart substationData Center Dynamics· Jan 23, 2025
- The search engine which doesn't track your movementsBishop's Stortford Independent· Oct 16, 2020
See something wrong or missing on this page? Suggest a correction.