Mapped (unverified)colocation
Civicos Networking DCLAGUNA
San Cristóbal de La Laguna, Canarias, Spain
Source: Primary source
Civicos Networking DCLAGUNA is a mapped data center in Canarias, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Canarias
Overview
source: linkCivicos Networking, S.L.U. — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- Exposición destaca la biodiversidad del territorio Poqomchi’ en San Cristóbal VerapazPrensa Comunitaria· May 27, 2026
- La ULL, ITER y Light Bridges impulsan el primer doctorado industrial en computación para liderar la astronomía robótica mundial - ULL - NoticiasULL· Mar 26, 2026
- La Nueva Centralidad del Este, un lienzo urbano en blanco lleno de oportunidadesNuevo Sureste· Apr 4, 2025
- Horarios de cortes de luz en Ecuador para este martes, 12 de noviembreEl Universo· Nov 11, 2024
- Horarios de los cortes de luz en Ecuador para este jueves, 31 de octubreEl Universo· Oct 30, 2024
- Horarios de cortes de luz en Ecuador para este sábado, 19 de octubreEl Universo· Oct 18, 2024
See something wrong or missing on this page? Suggest a correction.