Centro de Procesamiento de Datos del Gobierno de Cantabria
Santander, Cantabria, Spain
Source: OpenStreetMap
Centro de Procesamiento de Datos del Gobierno de Cantabria is a mapped data center in Cantabria, Spain, operated by Gobienro de Cantabria. DataCentersExposed has documented a 5,715 sq ft footprint at this site. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkCentro de Procesamiento de Datos del Gobierno de Cantabria is a mapped data center in Santander, Spain, operated by the Gobierno de Cantabria. Reported footprint is 5,715 square feet. Available records describe it as a Gobierno de Cantabria data center, with no parent entity above the regional government disclosed.
Operator chain
- Ultimate parentGobienro de Cantabria
- Files asGobienro de Cantabria
- This facilityCentro de Procesamiento de Datos del Gobierno de Cantabria
The grid behind this site
source: Ember · EurostatA large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- Google refuerza su red global con un centro de datos ligado al cable Sol en CantabriaData Center Dynamics· May 8, 2026
- Google compra una parcela en el PCTCAN para un centro de datos vinculado al cable submarino SolCadena SER· May 7, 2026
- Google compra una parcela en el Parque Científico y Tecnológico de Santander para construir un centro de transmisión de datosVozpopuli· May 7, 2026
- Cantabria pide incrementar su potencia eléctrica un 60% para que no peligre el centro de datosEl Diario Montañés· Dec 28, 2025
- El Polígono de Marina-Medio Cudeyo, cerca de colgar el cartel de completoEl Diario Montañés· Nov 14, 2025
- El Gobierno de Cantabria aprobará el PSIR del centro Altamira a final de año o principios de 2026Cadena SER· Nov 7, 2025