Building 2 is a mapped data center in Grand Est, France. DataCentersExposed has documented a 20,283 sq ft footprint at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~5-10 MW
Footprint
20,283 sq ft
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Grand Est
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Un data center ne puisant pas plus d'eau qu’un restaurant : l’audacieuse promesse de Microsoft face à la soif de l’IANumerama· Jun 3, 2026
- "Un impact sur le partage de l'eau" : la construction du plus grand data center d'Europe inquiète en Seine-et-MarneRadio France· Jun 1, 2026
- Data center : l’impact des infrastructures sur l’environnement et les solutions possibleslebigdata.fr· May 19, 2026
- Bouygues a débuté la construction d’un data center urbain à SydneyLe Moniteur· Mar 12, 2026
- Le data center géant de Digital Realty obtient son permis de construire à Bouc-Bel-AirMade in Marseille· Mar 10, 2026
- Près de Lyon : un data center à hautes exigences environnementales à Bron-Parilly en 2028mesinfos· Feb 19, 2026