Skip to content
DataCentersExposed
Mapped (unverified)

BrainServe

Crissier, Vaud, Switzerland

Source: OpenStreetMap

BrainServe is a mapped data center in Vaud, Switzerland. DataCentersExposed has documented a 21,156 sq ft footprint at this site. It runs on Switzerland's grid, which was 2% fossil-fuelled at 39 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Operator
Est. capacity
~5-10 MW
Footprint
21,156 sq ft
Grid carbon
39 gCO₂/kWh
Clean electricity
98%
Region
Vaud
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

data center

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
39 gCO₂/kWh
Clean electricity
98%
Fossil electricity
2%

National grid context, not this facility's own metering. Full country picture: Switzerland data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.