Barcelona Cable Landing Station is a mapped data center in Catalunya, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Catalunya
Overview
source: linkAFR-IX Telecom — colocation facility (8 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- Digital Realty abre su primer centro de datos en Barcelonacadenadesuministro.es· May 25, 2026
- Sant Adrià de Besòs arranca la transformación de una de sus calles más céntricas: 1.800 m2 y una inversión de 700.000 eurosMetrópoli Abierta· May 23, 2026
- Digital Realty abre su centro de datos en las Tres Chimeneas de Sant Adrià y proyecta un hub digitalMetrópoli Abierta· May 19, 2026
- España | Digital Realty pone en marcha su primer centro de datos en BarcelonaDPL News· May 18, 2026
- Digital Realty pone en marcha su primer centro de datos en BarcelonaObservatorio Inmobiliario· May 18, 2026
- Digital Realty se expande en España y pone en marcha un centro de datos en BarcelonaData Center Dynamics· May 18, 2026
See something wrong or missing on this page? Suggest a correction.