Skip to content
DataCentersExposed
Mapped (unverified)

Apollo Cable Landing Station

Monmouth County, NJ

Source: OpenStreetMap

Apollo Cable Landing Station is a mapped data center in Monmouth County, NJ. DataCentersExposed has documented a 25,904 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Operator
Est. capacity
~5-15 MW
Footprint
25,904 sq ft
Utility
Jersey Central Power & LT Co
Grid
PJM
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Apollo Cable Landing Station is a mapped data center site in Monmouth County, New Jersey, with a reported footprint of 25,904 square feet. It draws power from Jersey Central Power & Light Co inside the PJM grid. Operator and ownership details above the site are not disclosed in available records.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

What this site costs the grid

source: PJM RPM auction reports
PSEG (New Jersey) · 2027/28 auction
$333 /MW-day
Peaked at $245/MW-day in 2013/14 8.84× the rest of PJM

PJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's PSEG pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →

This site's capacity-market cost (estimated)
$607.7K to $1.8M/yr

An estimated ~5 to 15 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.

Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →

Air quality near this site

source: AirNow
28
O3
Good

Air Quality Index from the nearest AirNow reporting area (Monmouth County), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$179.6K
People of color
10%
Below poverty
5%
Tract population
3,866

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Allenwood Elementary School in Wall, is 1.1 mi from this site (409 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.