Amazon
Bexar County, TX
Source: OpenStreetMap
Amazon is a mapped data center in Bexar County, TX, operated by Amazon.com, Inc.. DataCentersExposed has documented a 104,910 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
Operator chain
- Ultimate parentAmazon.com, Inc.
- Files asAmazon.com, Inc.
- This facilityAmazon
In the news
source: Google News- Amazon (AMZN) Is Building A Missouri Data Center Campus In Its AI PushYahoo Finance· Jun 16, 2026
- Amazon Unveils Multibillion-Dollar Missouri Data Center InvestmentYahoo Finance· Jun 16, 2026
- What Amazon.com (AMZN)'s US$10 Billion Missouri Data Center Bet Means For Shareholderssimplywall.st· Jun 16, 2026
- Amazon Plans to Invest $10 Billion in Missouri to Construct a New Data Center Campusmarketscreener.com· Jun 16, 2026
- Amazon Selects Missouri for $10 Billion Data Center CampusPR Newswire· Jun 15, 2026
- AMZN stock jumps — Amazon announces multibillion-dollar data center expansion in MissouriMSN· Jun 15, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Amazon.com, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Long-Term Rural Enterprise Zone (Morrow County School District 1)$16,668,806Morrow County School District 1, OR · granted 2024 · term — yr · source
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 17 MW (interconnection capacity): 2 L/kWh cooling (hot climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (San Antonio), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Great Hearts Western Hills in San Antonio, is 1.0 mi from this site (1,056 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.