Acropolis Telecom Paris-Nation
Paris, Île-de-France, France
Source: OpenStreetMap
Acropolis Telecom Paris-Nation is a mapped data center in Île-de-France, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Île-de-France
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- "Un impact sur le partage de l'eau" : la construction du plus grand data center d'Europe inquiète en Seine-et-MarneRadio France· Jun 1, 2026
- Grand comme Paris, chaud comme 23 bombes atomiques par jour : le data center qui affole l'AmériqueLes Numériques· May 28, 2026
- « Nous ne voulons pas de cette IA » : les habitants de l'Utah s'opposent à un projet de data center plus vaste que ParisLa Tribune· May 26, 2026
- "C'est pharaonique" : à Fouju, en Seine-et-Marne, le projet du plus grand data center d'Europe inquièteici.fr· May 25, 2026
- Mobilisation en Seine-et-Marne contre le projet de plus grand data center européen : «Qu’est-ce qu’on va manger dans dix ans, des céréales ou de la dataLibération· May 16, 2026
- Fuite de PFAS , terres englouties : un énorme data center inquièteReporterre, le média de l'écologie· May 15, 2026