Mapped (unverified)colocation
5GN Melbourne Data Centre (MDC)
Melbourne, Victoria, Australia
Source: Primary source
5GN Melbourne Data Centre (MDC) is a mapped data center in Victoria, Australia. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
Victoria
Overview
source: link5G Networks — colocation facility (16 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%
National grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)- AWS to connect Melbourne data centre to recycled water supply in Victorian firstW.Media· Jun 19, 2026
- AWS data centre to use recycled water in MelbourneIT Brief Australia· Jun 18, 2026
- VIC plant to supply recycled water to Amazon data centreWaste Management Review· Jun 18, 2026
- Crestchic opens Melbourne depot in Asia-Pacific pushIT Brief Australia· Jun 17, 2026
- Map exposes bold data centre plan for Sydney and MelbourneNine.com.au· Jun 16, 2026
- Data centres vow to fund Australia’s renewables shift, not derail itSMH.com.au· Jun 14, 2026
See something wrong or missing on this page? Suggest a correction.