Skip to content
DataCentersExposed
operator

DC BLOX

DataCentersExposed tracks 1 data center operated by DC BLOX across 1 state, of which 1 is proposed or under construction, with 50 MW of reported power capacity.

Reporting by

Facilities
1
tracked
States
1
footprint
Pipeline
1
proposed / building
Reported power
50 MW
1 facilities

Where DC BLOX builds

FacilityLocationStatusMW
DC BLOX Nashville (Grassmere Park)Nashville, TNProposed50

Methodology & sources

Corporate parent chains and project codenames are resolved from SEC filings, state incorporation records, and permit documents. Each link carries a confidence level; low-confidence inferences are labeled.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.