Skip to content
DataCentersExposed
operator

Cloverleaf

DataCentersExposed tracks 3 data centers operated by Cloverleaf across 3 states, of which 2 are proposed or under construction, with 600 MW of reported power capacity.

Operator added from the FracTracker Alliance U.S. Data Centers Tracker.

Reporting by

Facilities
3
tracked
States
3
footprint
Pipeline
2
proposed / building
Reported power
600 MW
3 facilities

Where Cloverleaf builds

FacilityLocationStatusMW
Troy Cloverleaf Data CenterTroy, ILProposed500
Cloverleaf Data Center: Project Open SkyPiedmont, TXProposed
Carlton Cloverleaf Data CenterCarlton, WIWithdrawn100

Methodology & sources

Corporate parent chains and project codenames are resolved from SEC filings, state incorporation records, and permit documents. Each link carries a confidence level; low-confidence inferences are labeled.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.