Skip to content
DataCentersExposed
County data-center profile

Collin County, Texas

DataCentersExposed tracks 10 AI data centers in Collin County, Texas — 3 operating and 0 in the pipeline, led by Flexential Corp.. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Collin County, Texas has 10 tracked data centers, 3 of them operating. Its composite data-center risk score is 13 out of 100 — see the breakdown above for which factors drive it.

Facilities
10
Operating
3
Pipeline
0

Reporting by · Updated May 29, 2026

Risk breakdown
13Low
  • Project exposure · 23
  • Power demand · 0
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Collin County

Flexential Corp. has the largest presence in Collin County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

10 facilities

Every tracked facility

FacilityOperatorStatusMW
Aligned Data Centers
Plano
Prime Data CentersMapped (unverified)
Cisco AllenMapped (unverified)
CyrusOne AllenCyrusOne LLCMapped (unverified)
DataBank Plano Data Center
Plano
Prime Data CentersOperating
Evoque Allen DA1
Allen
Mapped (unverified)
Experian McKinney Data CenterMapped (unverified)
Flexential Dallas - Plano
Plano
Flexential Corp.Operating
Flexential Dallas - Richardson
Richardson
Flexential Corp.Mapped (unverified)
Stream DFW IVStream Data CentersMapped (unverified)
Tierpoint Dallas-AllenTierPoint, LLCOperating
Accountability

County commissioners

How the Collin County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.