Brazil · state
Ceará
DataCentersExposed tracks 3 AI data centers in Ceará, Brazil — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 1 tracked operator.
Sources: Brazil, Methodology
Tracked
3
Operating
0
In pipeline
0
Reported power
0 MW
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Facilities
Tracked data centers
- AngoNap FortalezaAngola CablesMapped (unverified)
- Mapped (unverified)
- CSL MonetAngola CablesMapped (unverified)
In the local press
Ceará data-center coverage
- CE quer exportar usando aviões com peças para data centerO POVO+· Jun 15, 2026
- Indígenas Anacé paralisam obra de data center do TikTok no CearáAndes-SN· Jun 12, 2026
- Voltalia garante conexão de 322 MW para data center em Pecém, no CearáMovimento Econômico· Jun 10, 2026
- Povo indígena Anacé ocupa data center do TikTok, no CearáO POVO+· Jun 9, 2026
- Data center do TikTok no Ceará será concluído em 2027- Misto Brasil· Jun 9, 2026
- O data center do TikTok no Ceará: o quebra cabeça por trás do gigante de R$ 200 bilhõesInvestNews· Jun 8, 2026
Live headlines via Google News — in English and Brazil's local press.